Guide
Finishing your Damascus apartment while you live outside Syria
Many apartment owners in Damascus live outside Syria, and many of them are getting the home ready now, before moving back or for holidays. Finishing from a distance works on three conditions: decisions made before work starts, photos from the site every day, and payments only for work that is done.

First: the power of attorney and papers
You need someone in Syria who holds an official power of attorney from you, to sign the contract, receive the keys, and deal with the building committee and the municipality if needed. Arrange the power of attorney before work starts, because handover and payments need someone with authority.
Also make sure the electricity and water meters are working: the site needs both from day one.
The survey while you are away
We survey the apartment free of charge and send you a photo survey with pictures and video. If nobody in Damascus can open the door for us yet, we start from the floor plan and a video filmed by a relative, and give a first estimate. The price is fixed after the survey, in a written scope.
Ask for a video call from inside the apartment, walking room by room with the supervisor, and agree where every bed, sofa and TV will go. The furniture decides where the switches and sockets go.
Decisions to settle before work starts
Every decision that waits while you are abroad means messages and delays, and sometimes breaking out finished work. Settle these before you sign:
- The furniture layout in every room, and with it the positions of switches, sockets and lights.
- How many air conditioners, where they go, and the route of their lines and condensate drains.
- The kitchen layout, and where the washing machine, dishwasher and water heater go.
- The type of tiles, doors and fixtures, chosen from samples you see in photos and video.
- Pre-wiring for solar, internet and cameras, even if you install them later.
Only the paint colors can wait: you choose them from a catalog before the painting stage.
How to follow the work from another country
Every project has its own WhatsApp group and a dedicated supervisor, and photos and video arrive there every day. Three shots to ask for by name:
- The electrical and pipe routes before the walls are closed.
- The pressure gauge during the water network test.
- The bathroom floor filled with water during the waterproofing test.
These photos stay with you, and they show where every pipe runs if you want to drill into a wall years later.
Paying from abroad
- Payments are tied to completed stages documented with photos, not to dates.
- Materials come with original invoices, photos of which reach you before you pay, and labor is a separate item.
- Any addition outside the scope is priced, and you approve it in writing on WhatsApp before it is done.
- The final payment comes after handover, once the remarks are fixed.
Handover when you arrive
You don't need to travel while the work is under way. When it is finished you walk through the apartment with the supervisor, in person or through your agent on a video call, and the remarks are written item by item with a deadline to fix them. The warranty is written: one year on paint and finishes, two years on waterproofing and pipework.
Mistakes owners abroad keep making
- Choosing a contractor by the price per meter on the phone, with no survey and no written scope.
- Relying on a relative to supervise, who doesn't know what to check or when.
- Approving changes on a voice call that leaves no written record.
- Paying a large sum up front before any work has started.
The questions to ask any contractor before you sign are in the guide How to choose a finishing contractor in Damascus.
Questions about finishing from outside Syria
Do I need to travel while the work is under way?
No. You follow it through the supervisor and the daily WhatsApp group, and you can attend the final handover if you wish.
Who signs the contract if I am abroad?
Your agent, with an official power of attorney. You stay in the WhatsApp group and approve every addition in writing.
When should I start if I plan to move back on a set date?
A 100 square meter apartment usually takes 45 to 75 days depending on the scope, plus a few days before that for the survey and the written scope. Count back from your arrival date, and leave a margin.
Start with a free site visit
Message us on WhatsApp with photos of the apartment or its floor plan and its location in Damascus, and we reply with a first estimate and a site visit date. The visit and the written scope are free, with no commitment.