Renovating an old apartment in Damascus: what to keep and what to replace?

In an old apartment the eye goes first to what it can see: faded tiles, peeling paint, tired doors. But how long a renovation lasts is decided behind the walls. This is how we sort what stays and what goes before we write a single item.

Elmas Decor · October 15, 2026

Setting new wall tiles

Check before you choose tiles

Before any talk of colors and materials, we go over four things:

  • Structure: cracks in walls or ceilings, damp patches, and exposed rebar in the ceiling.
  • Electrics: breakers that keep tripping, sockets that get hot, an old panel, and no earthing.
  • Water: weak pressure, rust-colored water when you first open the tap, and a leak showing on the ceiling of the neighbor below.
  • Drains: smells from the drains, slow draining, and blockages that keep coming back.

If there are cracks in a load-bearing wall or the ceiling, the decision starts with a written engineering assessment, and finishing comes after.

What gets replaced in most old apartments

Iron water pipes

Galvanized iron pipes rust from the inside over the years, so the pressure drops and the water turns colored. Replacing them with PPR pipes means opening the bathroom and kitchen walls, so it is done together with the new tiling, not after it.

Electrical wiring

The wiring in old apartments was designed for a fridge, a washing machine and light bulbs. Today a home has air conditioners, a water heater, an electric oven and an inverter. A renovation is the chance for separate circuits for the big loads, a new breaker panel and earthing.

Waterproofing in bathrooms and kitchen

Once the bathroom tiles come up, the old waterproofing beneath them is redone, then water-tested for a day or two before tiling. New tiles over spent waterproofing send the leak straight back to the neighbor's ceiling.

What may be worth keeping

  • Old mosaic tiles or marble: if they are sound and well bedded, they can be ground and polished back close to how they first looked, and some homes keep them for their character.
  • Solid wooden doors: they are repaired, repainted and given new locks and hinges, and many are sturdier than what gets fitted today.
  • Sound plaster: it is not all broken out. Only the damaged parts are repaired, plus the strips over the new wiring and pipe routes.

The decision on each item is written after the survey, with a photo of its condition.

Start with what will disappear behind the walls

The order in an old apartment: stripping out and demolition, then pipes and wiring, then testing and photographing them, then plaster patching and waterproofing, then tiles, gypsum board and paint, and last the doors and fixtures. Any visible item done before the hidden ones risks being broken out again.

Each stage and the reason for its place is explained in the guide Apartment finishing stages, in order.

Can you live in the apartment during the renovation?

It is possible in a partial renovation, one room at a time. But when the pipes and wiring are replaced and the bathroom and kitchen tiles come up, water and power will be off for days and the dust will reach every room. For that stage it is better to move out, and come back when the finishing work begins.

The building and the neighbors

  • Tell the neighbors and the building committee when work starts and how long the demolition will last.
  • The drain stack is shared between floors. If it is old, your apartment's connection to it is checked and sealed.
  • Rubble removal is agreed in advance, and it is never left on the stairs or the pavement.
  • For any change that touches a load-bearing wall or the facade, ask the municipality before work starts.

Questions about renovating old apartments

Can I renovate just the bathroom and kitchen?

Yes. We check the pipes up to the drain stack and the main water line, so new tiles are not laid over worn-out pipework.

How long does a full renovation of an old apartment take?

A full renovation comes close to the time for new finishing, usually 45 to 75 days for a 100 square meter apartment, plus the days for stripping out and demolition. The exact schedule is written after the survey.

Is the site visit paid?

The finishing survey and the written scope are free. A structural engineering assessment is a separate paid service, and its fee is deducted when you sign for the work.

Start with a free site visit

Message us on WhatsApp with photos of the apartment or its floor plan and its location in Damascus, and we reply with a first estimate and a site visit date. The visit and the written scope are free, with no commitment.

Get a free consultation and a first quote on WhatsApp

Contact us on WhatsApp